How We Work
Our Methodology
Cladding a mall façade with Christmas lights and decorating a villa garden are not the same process. Below you will find the standard phases we follow for each project type, the product classes we use, and our warranty terms in detail.
This process, distilled from 15 years of field experience, is designed to minimise delivery date overruns, budget surprises and post-installation issues.
Process
6-Step Project Process
Survey & Needs Analysis
Free, on-site- —Measurement of façade length, height and electrical infrastructure
- —Assessment of nearby routes and traffic flow
- —Reference sharing to understand client visual expectations
- —Budget range definition and feasibility assessment
For shopping malls and large municipal projects, the survey often requires multiple visits and is completed with a façade drawing and electrical engineer report.
Design & Visualisation
3–7 days- —2D site sketch or 3D visualisation presentation
- —Colour theme, motif density and animation (DMX/RGB) selections
- —2–3 alternative design options
- —Definitive contract and technical specification after approval
For large-scale (mall, municipality) projects, production does not begin before client approval. The visualisation stage eliminates end-of-project "this is not what I expected" risk.
Production & Procurement
5–15 days- —Standard products sourced from own stock
- —Custom sizes produced at Istanbul central manufacturing line
- —All products are IP65-IP67 certified for outdoor use
- —LED type selection: Kapsül LED (motif), SMD 2835 (curtain), COB (high-density)
Quality control on the production line is supported by a separate test process for each product series. No dispatch takes place without client approval.
On-Site Installation
1–7 days (depending on project scale)- —3–15 person on-site crew depending on project size
- —Cherry picker, scaffolding or rope access equipment for high-level access
- —Electrical connection standard: TS EN 60598-2-20
- —All crew members hold working-at-height certification
Shopping mall or street projects typically take 3–7 days. Villa installations are usually completed in 1–2 days. For municipal projects, a traffic coordination plan is prepared in advance and shared with relevant authorities.
Testing & Handover
1 day- —Comprehensive electrical test of all circuits
- —Night-time light session with client (handover in the dark)
- —Operations manual: timer programming, circuit diagram, troubleshooting
- —Activation of 24/7 technical support line for the duration of the season
Handover is carried out at night, not during the day — because light decoration can only be properly evaluated in darkness. The client sign-off is obtained after this session.
End-of-Season Dismantling
Date specified in contract- —Typical dismantling window: 5–15 January (confirmed in contract)
- —Rental packages: products stored; purchase packages: delivered to client
- —Removal protocol that leaves no marks or damage on façades, walls or poles
- —Equipment return and depot update
Dismantling is as technically demanding as installation. High-access equipment is redeployed. Post-season damage assessment is carried out and a condition report for the following season is forwarded to the client.
Service Types
Standards by Project Type
Shopping Mall Decoration
- ·Typical installation duration: 5–10 days
- ·Product class: IP65-IP67 (rain and frost resistant)
- ·High-access: cherry picker required
- ·Working hours aligned with visitor traffic
Municipality & Street Decoration
- ·Pole mounting, cable safety as priority
- ·Traffic planning and municipal approval process included
- ·Precise installation on high-visibility symmetrical areas
- ·Flexible night-time working
Hotel Decoration
- ·Lobby, exterior façade and garden integration
- ·Installation carried out without interrupting the guest experience
- ·Scheduling aligned with management approval protocol
- ·Season extension option (through to end of January)
Villa Decoration
- ·Garden tree wrapping, perimeter walls, pool surrounds
- ·Typical duration: 1–2 days
- ·12V/24V DC systems (safe, low voltage)
- ·Remote-controlled timer options
Store Decoration
- ·Shop window LED curtain, façade lighting
- ·Installation compliant with mall interior regulations
- ·Night-time installation aligned with daily trading hours
- ·Small scale: completable in 1 day
Dual-Season Installation
- ·December–January (New Year) + March–April (Ramadan) joint installation
- ·Fixed infrastructure, interchangeable product adaptation
- ·Single contract for two seasons, cost advantage
- ·Storage and reinstallation included
Technical Standards
Product Classes & Certifications
IP Protection Ratings
Indoor / sheltered area
Indoor and sheltered balcony use only — not an outdoor standard
Standard outdoor (minimum)
Full outdoor use, rain and wind resistant
High-humidity areas
Short-term submersion (pool surrounds, ground installations)
A minimum IP65-IP67 standard is applied to all outdoor projects; IP65-IP67 is used for pool surrounds and ground-level installations.
LED Types & Application Areas
Kapsül LED
14–17W/m
Motif, figure, tree wrapping — bright, RGB colour
SMD 2835
9–12W/m
LED curtain, ground strip — wide-area coverage
SMD 3528
4–5W/m
Decorative framing, ambient lighting
COB
20–25W/m
High-density lighting, stage-quality light
Voltage: 220V AC (large corporate projects), 24V/12V DC (villas, stores and accessible areas). Warranty: LED strip 2 years, motif products 1 year.
Warranty
Frequently Asked Questions
What is the warranty period for LED products?
2-year manufacturing defect warranty. Valid under normal outdoor use conditions (compliant with IP65-IP67 standards).
What does the installation warranty cover?
1 season (the December–January period from installation to dismantling). 24/7 on-site response service for any faults during the season.
What does IP65-IP67 mean?
IP65-IP67: full dust protection + resistance to water jets from any direction. This is the minimum standard for Turkish outdoor conditions (rain, snow, frost).
What situations are excluded from warranty?
Natural disasters, fire, vandalism and client intervention (unauthorised wiring, physical damage). A separate repair quote is prepared for these cases.
Logistics
81-Province Logistics Infrastructure
The ability to carry out parallel installations across Turkey in December is made possible by a logistics coordination structure built up over many years.
Istanbul Central Coordination
All project schedules are planned through the Istanbul headquarters. For major cities, crews are dispatched in advance.
Parallel Installation Schedule
Simultaneous installations in different Turkish provinces during December are managed with a project-based crew roster.
Local Logistics Compliance
Municipal permits, crane routing and local infrastructure requirements are assessed project-specifically during the survey phase.
All 81 Provinces Covered
We serve all provinces of Turkey. Logistics costs for remote provinces are included in the quotation.